



























|
|
I decided to pre-assemble the front two trusses, their overhanging purlins, the edge fascia, and the decorative peak on the ground. Then, the crane would be able to lift it with one motion and I would be saved from doing all that work way up in the air. I did the same for the rear overhang.

|
|
|